This job is closed
Applications are no longer available for this announcement. Explore current related opportunities below.
Job description
Low Voltage Foreman
LINX is hiring a Low Voltage Foreman to lead crews on hyperscale data center and commercial construction projects in the Salt Lake City area. This is a working foreman role — you know the work from the ground up, you can train technicians to do it right, and you're ready to own the daily execution of complex structured cabling and fiber scopes on large, fast-moving jobsites.
You'll report to the Project Manager and serve as the primary field leader on your assigned projects — the person who makes sure the crew is productive, the materials are staged, the quality is right, and the customer sees a professional operation every day.
Pay: $30.00–$38.00/hour based on experience.
Where This Role Fits at LINX
LINX runs a clear field leadership ladder: Technician → Lead Technician → Foreman → Superintendent → Project Manager. This role is the critical bridge between hands-on installation and project-level leadership. Foremen at LINX who perform well move into Superintendent roles as project volume grows — and our pipeline is growing consistently across the USA.
What You'll Be Doing
Crew Leadership & Workforce Management
Lead a team of low voltage technicians on active hyperscale data center and commercial construction jobsites — setting daily goals, managing productivity, and solving problems in real time
Handle workforce planning for your projects — crew scheduling, labor tracking, timesheet completion, and coordination with contract workers when scope requires additional hands
Train technicians in installation methods, test equipment operation, safety procedures, and quality standards —you're expected to develop the people on your crew, not just direct them
Identify and address personnel issues on-site, escalating to the Superintendent or PM when appropriate
Project Execution & Quality Control
Own daily execution of structured cabling, fiber optic, and low voltage infrastructure scopes — high-density fiber optic networks, Cat6A/Cat8, pathway systems, etc.
Monitor job progress against schedule daily, track costs using project reporting tools and Bluebeam, and adjust crew deployment and material staging to protect the timeline
Manage Moves, Adds, and Changes (MACs) — tracking scope changes for materials and labor accurately and ensuring proper documentation flows to the PM and estimating team
Oversee on-site materials management — ordering supplies, coordinating deliveries, managing warehouse communication, and ensuring materials are staged and accounted for
Quality & Safety
Operate and interpret results from test equipment including Fluke Testers, OTDR's & power meters — and ensure all test documentation meets project specifications and client standards
Lead daily safety compliance on-site — toolbox talks, hazard identification, PPE enforcement, and adherence to site-specific safety plans, particularly the stringent access control and safety requirements common in hyperscale data center environments
Conduct quality control checks throughout installation — not just at close-out — and hold your crew to LINX standards at every phase
Customer & Stakeholder Communication
Maintain professional, proactive communication with clients and GCs at your assigned sites — represent LINX as a competent, organized operation every day on site
Participate in pre-bid walkthroughs and post-project reviews with Project Managers, Estimating, and Sales
Escalate customer concerns, scope conflicts, or schedule risks to the PM immediately—don't let small issues become large ones
Requirements
Experience
3–5 years of hands-on low voltage or structured cabling installation experience, with mastery of installation methods, tools, and quality standards across copper and fiber systems
1–2 years in a field leadership role — Lead Technician, working Foreman, or equivalent — where you were responsible for crew productivity and quality, not just your own work
Experience with hyperscale data center clients such as AWS, Google, Microsoft, Meta, OCI etc.
Technical Skills
Full mastery of low voltage tools, equipment, and installation processes — you can do everything you're asking your crew to do, and you can teach it
Ability to read and interpret construction documents — Scope of Work, Bill of Materials, as-builts, blueprints, and project schedules
Proficiency with industry-standard test equipment and the ability to run tests, interpret results, troubleshoot failures, and produce clean documentation
Familiarity with project cost tracking and Bluebeam Revu for document management and markup
Working knowledge of applicable industry standards - BICSI, Division 27, etc.
Leadership & Communication
Demonstrated ability to lead, train, and hold accountable a crew of 10-20 technicians in a fast-paced construction environment
Strong written and verbal communication in English — you will interact directly with clients, GCs, and internal teams on a daily basis
Ability to manage staffing, scheduling, timesheets, and change order documentation accurately and on time
Logistics
Valid driver's license require
Preferred (not required)
BICSI Installer 1 or Installer 2 Certification
BICSI Technician
Confined Space Certification
OSHA 10 or OSHA 30
Manufacturer-specific certifications
Ability to travel across the USA for projects
Compensation & Benefits
Pay Rate: $30.00–$38.00/hour depending on experience
Bonus: Performance-based bonus opportunities available
Benefits:
401(k) with 50% employer match on first 5% contributed
Medical, dental, and vision insurance with FSA and HSA options
Short and long-term disability coverage
3 weeks PTO (vacation and sick combined)
8 paid holidays
Cell phone allowance
Ongoing technical training and certification support
About LINX:
Founded in 2003 by working industry practitioners, LINX has grown across the USA and has completed projects in all 50 states. We design, install, and support commercial network cabling, fiber, AV, security, and wireless systems for data centers, commercial buildings, and mission-critical environments.
Our data center business is active and expanding. The foremen we hire now are building the foundation of a field leadership team that will grow with the company across existing and new markets.
Posting Deadline:
This job posting is open until filled and may close at any time without notice.
We are an equal opportunity/affirmative action employer. We consider candidates regardless of race, color, religion, gender, sexual orientation, gender identity, national origin, disability, or status as a protected veteran, and encourage minorities, females, veterans, and individuals with disabilities to apply.
Worksite address
salt lake city, UT, 84193, US
Who can apply
Review the original listing for work authorization, qualifications and employer requirements.